Gas Charging Trainer

The ?HANSA? unit trainees can learn working within a complex project. This involves the planning, implementation and checking of processes related to assembly, commissioning and maintenance. The assembly relates to refrigeration installation: installation of the LP and HP pressure switches, the expansion valve and the pipework of the refrigeration circuit. The pipe joints are not soldered but bolted. The electro technical installation includes the wiring and connection of all units and switching elements.

The experiment is arranged on a workbench with drawers for storing the components and tools. Assembly panel and refrigeration chamber are mounted on a frame. Frame, condensing unit and switch cabinet are bolted permanently to the working surface. The refrigeration and electrical components are attached to the aluminum assembly panel.

Book Product